Energy storage isn’t just about batteries—it’s about integration that works

Across the BESS projects we’ve been involved with, one thing keeps surfacing in project discussions: most delays and risks don’t come from the batteries—they come from what connects them.

At Kookaburra Power Technologies, we’ve developed a set of optioned BESS models to give project teams the clarity and flexibility they need, without compromising on safety or standards.

🟫 Semi-integrated configurations provide a compliant foundation with battery racks, cooling, fire suppression, and earthing—perfect for teams who want control over PCS, EMS, or site-level integration.

🟨 Fully integrated systems come pre-assembled with batteries, BMS, HVAC, fire protection, with PCS, EMS—ready to drop in, connect and commission with minimal on-site work.

🟧 Container-sized and smaller commercial and industrial BESS solutions available.

Brunstock BESS, PCS, step-up transformer skid station

What ties them together is our commitment to:

✔ Matching AS/NZS requirements
✔ Prioritising operator safety
✔ Reducing project risk through clearer integration and documentation

Speed matters in energy storage, but durability and compliance can’t be compromised. At Kookaburra, we focus on delivering practical, safe and integration-ready BESS systems, where success comes from getting the details right early, with clear documentation, defined interfaces, and shared accountability.

Find out more